Hello everyone. Despite selecting I plan to buy Lightning Lane access via Genie+ for around $29/ticket and Optimizing several times, my first step to “Obtain Lightning Lane for [Attraction]” doesn’t appear until after 3pm, and only for one attraction (despite many LL attractions appearing in my plan). It seems wrong that I wouldn’t try to get a LL earlier in the day.
Separate issue: I have 138 minutes of free time after only my second attraction, before lunch. That seems like a waste of time, right?
1 Like
Try adding steps or large breaks. You don’t have enough on your schedule.
Tagging into this thread even though my issue is different. I added a LL for FoP at 3:30. At the bottom section it says. “Your Lightning Lane Single Pass Selections:
• Avatar Flight of Passage ($14) at 3:30pm”
However, in my plan steps it says, “Avatar Flight of Passage
Minimum Height: 44 in
Use LL for 3:00pm‑4:00pm”
I tried toggling “Force Use of Inputted Lightning Lane Return Times” but that didn’t seem to make a difference. I’ve tried optimize and evaluate. It’s like the front end knows what time it is but the part doing the calculations does not.
1 Like
What time does it have you using the LL?
Have you tried deleting the step and the LL and re entering them? Then try evaluate?
Just thinking out loud.