Thanks for enabling my laziness and not forcing me to switch tabs and google it myself!
YVW. I aim to please
Iāve read that the ride system is more or less ready, but there is still work to be done on the stations. But I agree; the original plan was for it to be open a month or two before SWGE, so I think sometime in July is reasonable; perhaps theyāll time it with the 4thā¦
Interesting. I had always been under the impression that both benches āfaced forwardā, with the rear bench being slightly elevated. Obviously not the caseā¦
I thought I saw a photo, similar to the one @OBNurseNH posted, that showed one bench flipped up for more room for ECVs. I donāt recall if it was on TP or WDWMagic. I couldnāt find it just now.
Is generation gap bridge between AOA and POP closed? Someone mentioned this but Disney didnāt announce any bridge closures during the skyline construction? The website doesnāt show anything, only pool closures in 2020.
Last I read, there were construction walls around the station, but you can still cross the bridge.
I saw 2 day ago that the cover came off one due to high winds. I think that is why they took the others off, the cat was out of the bag (thanks mother nature.)
There were a few others that were uncovered already though. I wasnāt sure why they said that since I had seen some uncovered well before that statement was made
There are pictures of one with the wrap literally hanging by a thread, I think on BlogMickeyās site.
But they have also uncovered several others.
However, testing on the CBR to Epcot IG line is well behind the others, with a lot of work still needed at the Riviera station. Itās possible they could open in phases though. I havenāt seen anything yet on current thinking.
Part of the bridge is has the construction boards up, however it is still possible to cross the bridge, just a little bit more narrow of a walkway. I used it on May 7.
Hereās an update on the EP lineā¦